Models View all
Work experience
Owner/Designer
MC-CONSULTING Marcin Chyba
•
January 2018 - present
Development of conceptual documentation (construction, wall fillings, installations, fire resistance, acoustic insulation and fire insulation)
• Making patent claims
• Development of research documentation
• Conducting fire, acoustic, thermal, functional and utility tests NRO fire tests
• Permanent product development through the elaborate of new solutions and on based on market research.
• Optimization the solutions at an angle of used materials and technology of production and assembly.
• Developing solutions in accordance with the regulations in force in the target country of sale.
• Developing the production technology.
• Developing the assembly technology.
• Admission of products like/materials like doors windows, boards, connectors, etc on target markets.
• Execution of European technical approval.
• Technical opinions for implementation.
• Realization / Service technical opinions.
• Developing alternative solutions during cost estimation.
• Developing of production technology and new solutions assembly.
• Selection of solutions and materials used in accordance with the regulations and other requirements.
• Preparation of documentation with the preliminary selection of materials.
• Arrangements with research institutions.
• Preparation of technical and / or admission documentation.
• Possible certification
Technical manager
Opeus Sp. z o. o. Group
•
August 2011 - December 2017
Measurements of the construction contract for entrusted
Preparation of design documentation on steel and aluminum joinery
Participation in meetings of project
Preparation and orders regarding material requirements
Creation of workshop ironwork steel and aluminum
Production orders, coordinate deadlines
Create assembly documentation for steel and aluminum joinery
Contacts with subcontractors (purely technical / dot. Mounting)
Supervision schedule
Preparation of documentation for the individual use of the facility
Preparation of documentation to create approvals
All tests ordered in the ITB Technical Approval
Help with offers and advice
Contract Engineer
BEM Brudniccy Sp. z o. o.
•
April 2009 - July 2011
Preparation and orders regarding material requirements
Creation of workshop steel ironwork
Production orders, coordinate deadlines
Create assembly documentation regarding steel ironwork
Preparing as-built documentation / application unit in the building
Prints projections, sections of buildings
Creating documentation for the installation carpentry doors
Preparation of material requirements
Preparing as-built documentation
Drawings of the equipment door woodwork
Education
Warsaw University of Technology
M. Sc., Eng., Institute of Mechanical Engineering Mechanical Systems and Automation
•
January 2004 - January 2010
Also Institute of Mechanical Engineering
Machinery and Equipment for the Chemical and Food-Processing Industries