Autodesk Inventor Users

Created by Constantin STANCESCU on 25 April, 2018

Info needed to keep wire vertical on crane

The block and wire has been assembly to the boom-top with joint/rotational command maybe that's the wrong way to do it?In a perfect world the wire stays vertical all the time. Any hints?

1 Answer

it's hard to make a statement, but just looking at your picture I would assume that your Block is modeled symmetrically. Try an angular constraint between the symmetry plane and the floor